These pictures are over a course of approx. 5 days.
The well did get dug successfully.
Lots of good muck and mud around it, which is a good sign.
We saw this saying on another well drillers truck
"Abundant Water for Abundant Living"
that's what we have here.
The well is placed beside the garage end.
On the roof above the outdoor room
there is a hole cut.
That is for the chimney for the fireplace,
it is going to have brick on it.
This is a great feature:
All the downspouts will be tied into these pipes
so that there will be no rainwater around the house.
It gets directed out to the pond.
The cubby in the walk in shower for shampoo and such.
The seat in the walk in shower. It will be tiled over.
Setting the jet tub.
It will have tile installed on the deck.
The frame of the fireplace.
All the showers have been set.
And we now have garage doors!
The house is all locked up now.
Next week will bring plumbing, siding and possibly brick.