Friday, August 27, 2010

Taking A Break

I am taking a break for moving.  Our internet has been shut off, so I will be back on in about a week and a half with all that has happened in the meantime.  See you back around Sept. 8th.

Robin

Wednesday, August 25, 2010

House Pics 08-25-2010

Refrigerator was installed and also cooling.  The big spot at the top is for a television.

The island sink faucet and the hole to the left is for the air button to turn on the garbage disposal.
Kitchen sink faucets.


Tom's bar with the brass rail.
The fireplace logs are all set up.


Here is the new high teck way of installing a sink.
Have something heavy in the sink and use the great invention....duct tape to hold it down. 




Just Jhokin! ;-) wink wink

These were really a welcome sight.
The windows open up so easily now. 

Monday, August 23, 2010

House Pics 8-23-2010

The Beautiful Black Door
It will have a brass kick plate and a long brass door handle.



The vent fan and cook top.

A better look at the cook top.

The rest of the cupboards.


The coffee bar as we call it.
Above and below are places for my cookbooks.
I have two spice rack cupboards.


This space above the double oven has spots for cookie pans etc.
This is the potting table in the outdoor bathroom
Low and behold we have the real thermostats in.

Thursday, August 19, 2010

House Pics 08-19-2010

The double doors got put on the big closet today.

The pedestal sink and toilet and lights were installed in the powder room.
The blue and orange pendant lights were installed over the bar.
One outdoor light was put up.  The glass is called waterglass. 
The pavers were laid out for the sidewalk and steps.
It looks like they came up 4 short.
The yard was also smoothed out today.
From the back along the side of the house.

Wednesday, August 18, 2010

House Pics 8-18-2010 Lots to show

Here is the folding table in the laundry room.

A close up of the pretty leg.

Cabinet and hanging pole above the washer and dryer.


Here is a hanging area for long items.

My desk for the computer, sewing and studying.
The keyboard area.

This has 5 file drawers and an ironing board and a regular drawer.
file drawer

ironing board


The finishing touches are getting put on the windows.

Here is the faucet and sprayer for the tub.

I think it will be a handy contraption.
Here are the start of the kitchen cabinets.
The 5 X 7 multipurpose island.
It has the dishwasher, service sink with disposal, microwave, pull out trash can, seating for 4 and drawers for pots and pans.
Here is the hutch for the dishes, glasses, silverware, linens and plastic containers.

Where the sink is at.

The foyer floor is finished.
Along with the powder room.

The end of the bar was installed.
In the box on the bar is the brass foot rail.

The hardware was put on and the sink installed.

Tuesday, August 17, 2010

House Pics 08-17-2010



The Cherry Bar got installed today.



Downstairs bathroom vanity
It's a distressed finish


One of the master bath vanities.
There are his and hers.


The doors on the front of the tub


Floor looking into the gathering room


Floor is complete in the kitchen and nook


Another angle of the gathering room


Tom had to have his first drink at his bar. 
He and his Bubba Keg

Another view of the bar


This is where the keg cooler will go.