The double doors got put on the big closet today.
The pedestal sink and toilet and lights were installed in the powder room.
The blue and orange pendant lights were installed over the bar.
One outdoor light was put up. The glass is called waterglass.
The pavers were laid out for the sidewalk and steps.
It looks like they came up 4 short.
The yard was also smoothed out today.
From the back along the side of the house.
No comments:
Post a Comment